GRACE’s Radisson hotel kitchen project in Zimbabwe: complete kitchen services from CAD design to installation, supported by selected hotel project references.
Plan kitchen routes, hygiene separation and building services before fixing equipment positions, with a practical decision table and GRACE process references.
How to specify a commercial smokehouse oven in 2026: sizing by trolley not volume, the four smoke generator types, EU PAH limits for smoked meat, utilities that catch site teams out, and indicative FOB China prices.
Hygienic design is decided on the drawing, not at the inspection. Materials and Ra limits, NSF/ANSI 2 radii, weld and coving detail, FDA clearance rules, IP ratings for washdown areas, and a ten-clause hygienic specification you can paste into a tender.